LogoLogo
Contact SupportRequest Access
  • Home
  • Overview
    • Getting Started
    • Installation
    • Starting a new TimeTable Project
    • Licensing
    • Microsoft Visio
    • TimeTable Ribbon
    • Configure TimeTable Window
  • Importing
    • Supported File Formats
    • Prepping your schedule
    • Importing a Schedule
    • Updates
    • Update Troubleshooting
  • Plan Mode vs Print Mode
  • Timescales
  • Manual Mode
    • Creating Blank Pages
    • What is Manual Mode
    • Adding Manual Tasks
    • Synchronized Copies
    • Step 1: Create a manual page
  • Styles
    • Using the Color Legend with imported metadata
    • Changing Colors
    • Set consistent colors across projects
  • Relationship Links
  • Critical
  • Abbreviations Tool
  • Print to scale
  • Best Practices
    • Multi-Page
    • Limitations
    • Activity Descriptions
  • 🔗Relationships
    • Imported vs Manual
    • Driving vs Non-Driving
  • Label Maker
  • Label Maker
    • Fields
    • Functions
      • List of Functions
  • Tools
    • Abbreviations
    • Label Maker
  • Troubleshooting
    • Extra TimeTable Shapes
Powered by GitBook
On this page
  • Understanding Project Dates vs Page Dates
  • Creating a page

Was this helpful?

Export as PDF
  1. Manual Mode

Step 1: Create a manual page

Unlike CPM software, to start scheduling a project, you need have a general idea of when your project starts and finishes. You can change these as needed, but you'll need to know the general duration of your project.

Understanding Project Dates vs Page Dates

In May 2021, we released a version that introduced the concept of Project Start and Finish.

In TimeTable, you can set a Project Start and Finish, but because you can have multiple pages in Visio, these pages can have separate dates from each other, as long as they're within the project dates.

Creating a page

PreviousSynchronized CopiesNextUsing the Color Legend with imported metadata